BACKGROUND LITERATURE
Vrijling, J.K., van Gelder, P.H.A.J.M., Goossens, L.H.J., Voortman, H.G. and Pandey M.D. (2001). A Framework for Risk criteria for critical infrastructures: Fundamentals and Case Studies in the Netherlands , 5th Conference on Technology, Policy and Innovation "Critical Infrastructures", in Delft, The Netherlands, June 26-29, Uitgeverij Lemma BV, ISBN 90-5931-019-5.
O'Connor A. and Enevoldsen I., (2008), ‘Probability based assessment of an existing prestressed post-tensioned concrete bridge’, Engineering Structures, 30(2008), pp. 1408 -1416.
CEDR Report (2009). Future European Road Network, (FERN).
CEDR Report (2012). Adaptation to Climate Change.
Decò, A., & Frangopol, D. M. (2011). Risk assessment of highway bridges under multiple hazards. Journal of Risk Research, 14(9), 1057-1089.
O'Connor A., Sheils E., Breysse D. and Schoefs F., (2012), ‘Markovian Bridge Maintenance Planning Incorporating Corrosion Initiation and Non‐Linear Deterioration’, ASCE Journal of Bridge Engineering. 18(3), pp. 189 - 199.
Reale T. and O’Connor A., (2012), ‘Cross Entropy as an Optimisation Method for Bridge Condition Transition Probability Determination’, ASCE Journal of Transportation Engineering. 138(2012), pp. 741 -751.
Sheils E., O'Connor A., Schoefs F., Breysse D., Yotte S., (2010), ‘Development of a two stage inspection process for assessment of deteriorating infrastructure’, Reliability Engineering and System Safety. 95(2010), pp. 182 - 194.
O’Connor A., Pedersen C., Gustavsson L, Enevoldsen I., (2009), 'Probability based assessment and optimised maintenance planning for a large riveted truss railway bridge’, Structural Engineering International. 19(4), pp. 375 - 383.
O'Connor A. and Enevoldsen I., (2008), ‘Probability based assessment of an existing prestressed post-tensioned concrete bridge’, Engineering Structures, 30(2008), pp. 1408 -1416. O'Connor A. and O’Brien E., (2005), ‘Mathematical Traffic Load Modelling and Factors Influencing the Accuracy of Predicted Extremes’, Canadian Journal of Civil Engineering, 32(1), pp. 270 - 278.
Landslides in Ireland, (2006) Geological Survey of Ireland Landslides Working Group, ‘Chapter 4 - Geotechnics of Landslides’ E.Farrell, M.Long, K.Gavin (25%) and T.Henry, Published by the Department of Communications, Marine, Natural Resources and the Geological Survey of Ireland.
Geophysical and geotechnical assessment of a railway embankment failure, Shane Donohue, Kenneth Gavin and Ali Tooliyan, Journal of Near Surface Geophysics. Vol 9, No.1, February 2011, pp 33-44, DOI: 10.3997/1873-0604.2010040
Use of a genetic algorithm to perform reliability analysis of unsaturated soil slopes, K.Gavin & J.Xue, Geotechnique, Vol. 59, No. 6, 2009, pp 545-549. DOI 10.1680/geot.8.T.004
‘Effect of rainfall intensity on infiltration into partly saturated slopes’ J.Xue and K.Gavin, Journal of Geotechnical and Geological Engineering, Volume 26, No. 2, April 2008, pp 199-209.
A simple method to analyse infiltration into unsaturated slopes’ K.Gavin & J.Xue, Computers and Geotechnics, Volume 35, Issue 2, March 2008, pp 223-230.
Simultaneous determination of the critical slip surface and reliability index for slopes, J.Xue and K.Gavin, ASCE Journal of Geotechnical and Geoenvironmental Engineering, Volume 133, No.7, July 2007, pp 878-886.
Žnidarič, A., Kreslin, M., Lavrič, I., Kalin, J. (2012). Modelling traffic loads on bridges - a simplified approach using bridge WIM measurements. V: JACOB, Bernard (ed.). International Conference on Heavy Vehicles ICWIM 6: Dallas, Texas, June 4 - 7, 2012. London: ISTE; Hoboken: Wiley, 2012, pp. 418-428.
Žnidarič, A, Lavrič, I. (2010). Applications of B-WIM technology to bridge assessment. Frangopol, D.M. (Ed.). Bridge maintenance, safety and management and life-cycle optimization: proceedings of the 5th International conference on bridge maintenance, safety and management, Philadelphia, Pennsylvania, USA, CRC Press, pp. 1001-1008.
Žnidarič, A., Lavrič, I., Casas, J.R. How safe are our existing bridges?. TRA, Transport Research Arena Europe 2008, Ljubljana, Slovenia, 21-24 April 2008. Proceedings. Ljubljana.
Žnidarič, A. (2010). Report P 901/09-670-1 – Methodology for safety assessment of bridges on the national road network. In Slovene. Ljubljana: ZAG.
André D. Orcesi, Dan M. Frangopol, Optimization of bridge maintenance strategies based on structural health monitoring information, Structural Safety, Volume 33, Issue 1, January 2011, Pages 26-41,
Benjamin Richard, Frédéric Ragueneau, Lucas Adelaïde, Christian Cremona, A multi-fiber approach for modeling corroded reinforced concrete structures, European Journal of Mechanics - A/Solids, Volume 30, Issue 6, November–December 2011, Pages 950-961.
Orcesi, A.D. & Frangopol, D.M. (2011). A stakeholder probability-based optimization approach for cost-effective bridge management under financial constraints, Engineering Structures, Elsevier, 33(5), 1439-1449.
Orcesi, A.D. & Cremona, C.F. (2011). Optimization of maintenance strategies for the management of the national bridge stock in France, Journal of Bridge Engineering, ASCE, 16(1), 44-52.
Orcesi, A.D. & Cremona, C.F. (2010). A bridge network maintenance framework for Pareto optimization of stakeholders/users costs, Reliability Engineering & System Safety, Elsevier, 96(1), 1230-1243.
O’Connor A., Pedersen C., Gustavsson L, Enevoldsen I., (2009), 'Probability based assessment and optimised maintenance planning for a large riveted truss railway bridge’, Structural Engineering International. 19(4), pp. 375 - 383.
O'Connor A. and Enevoldsen I., (2008), ‘Probability based assessment of an existing prestressed post-tensioned concrete bridge’, Engineering Structures, 30(2008), pp. 1408 -1416.
Alex. W. Dawotola, P.H.A.J.M. van Gelder & J.K. Vrijling, 2010. Multi Criteria Decision Analysis framework for risk management of oil and gas pipelines, Pages 307 - 314. In: Reliability, Risk and Safety – Ale, Papazoglou & Zio (eds) © 2010 Taylor & Francis Group, London, ISBN 978-0-415-60427-7.
Criteria for Acceptable Risk in the Netherlands , J. K. Vrijling, P. H. A. J. M. van Gelder, and S. J. Ouwerkerk, Infrastructure Risk Management Processes: Natural, Accidental, and Deliberate Hazards, 2005, Softcover, 304 pages, ISBN 0784408157, American Society of Civil Engineers.
J.K. Vrijling, P.H.A.J.M. van Gelder, L.H.J. Goossens, H.G. Voortman, and M.D. Pandey A Framework for Risk criteria for critical infrastructures: Fundamentals and Case Studies in the Netherlands , 5th Conference on Technology, Policy and Innovation "Critical Infrastructures", in Delft, The Netherlands, June 26-29, 2001, Uitgeverij Lemma BV, ISBN 90-5931-019-5.
P.H. Lin, A.R. Hale, C. van Gulijk (2013). A paired comparison approach to improve the quantification of management influences in air transportation, Journal of Reliability Engineering & System Safety 113(1).
A.L.C. Roelen, P.H. Lin, A.R. Hale (2011), Accident models and organisational factors in air transport: the need for real models, Safety Science, Volume 49, Issue 1
Chaug-Ing Hsu and Pei-Hui Lin (2005), Performance Assessment for Airport Noise Charge Policies and Airline Network Adjustment Response. Transportation Research Part D: Transport and Environment, Volume 10, Issue 4, July 2005, Pages 281-304
Adey, B., Hajdin, R., & Brühwiler, E. (2003). Supply and demand system approach to development of bridge management strategies. Journal of infrastructure systems, 9(3), 117-131.
CEDR Report (2007). Report on 60-t Vehicles.